Put a number on failed batches. Five inputs, one answer, then a triage call if the number is worth it.
Assumes a failed batch is a total loss of that harvest's wholesale value. Remediation and retest costs are not included.
Your numbers ride along. We look at the rooms, the testing cadence and the protocol, and tell you what would move the pass rate first.