Four steps that stand on their own or run as one package: assess, design, build and equip, commission and optimize. Commissioning and optimization are the steps nobody else packages.

01Existing facility or site. On-site or remote.
02Program, rooms, environment, equipment schedule, lender-ready model.
03Spec'd gear through the marketplace and the brands we distribute.
04SOPs, setpoints and first-harvest tuning.
Every drawing, schedule and setpoint traces back to these three numbers.
Walls move for free on paper. Ductwork, panels and drains do not. [TK]

| Discipline | Assessment | Design Package | Build and Equip | Commissioning |
|---|---|---|---|---|
| LayoutProgram, rooms, flow, dry and cure, post-harvest | Findings | Concept and schedule | Spec and sourcing | Setpoints and SOPs |
| HVAC and environmentLoads, dehumidification, airflow, setpoints | Findings | Concept and schedule | Spec and sourcing | Setpoints and SOPs |
| Electrical and lightingFixture schedule, PPFD, panel loads, utility | Findings | Concept and schedule | Spec and sourcing | Setpoints and SOPs |
| IrrigationZones, fertigation, water treatment, sensors | Findings | Concept and schedule | Spec and sourcing | Setpoints and SOPs |
| ComplianceRules by state, SOP integration, testing regime | Findings | Concept and schedule | Spec and sourcing | Setpoints and SOPs |
Yes. Every step stands on its own. Most operators start with the assessment.
Each step is scoped per project; the assessment is priced per square foot [TK].
3 to 6 months for a ground-up build from program to commissioning.
Your engineer of record, working from our package. We coordinate.
Through the marketplace and the brands we distribute, or you buy elsewhere from our spec.
Bring your license status, canopy and timeline. We bring the questions.