New licensees and applicants —

From license award to first harvest, without the redesign.

The facility side of your application and your first build: program, rooms, environment, equipment schedule and the lender-ready model, before concrete.

1M+ sq ft designedFour state hubsLender-ready package
Before you break ground —

Five things the lender and the inspector will ask for

Program
Canopy, rooms and the ratio of veg to flower that your license tier allows.
Rooms
Dry, cure, post-harvest and the corridor between them, sized to the harvest, not the lease.
Environmental concept
Loads, dehumidification and airflow per room, before the HVAC quote.
Equipment schedule
By room, with lead times, so the budget is real.
Lender-ready model
Room-level revenue and cost per gram that survives diligence.
The build timeline —

Six phases from award to first harvest, with how we help in each

  1. 01

    License award

    Site control, utility letters, the program locked

    How we help —We run the site and program review and set the basis of design.
  2. 02

    Design

    Concept layout, environment, lighting, irrigation, equipment schedule

    How we help —We deliver the design package and the lender-ready model.
  3. 03

    Permitting

    Engineer of record, local approvals

    How we help —We support the stamped set and answer the reviewer's questions.
  4. 04

    Build-out

    Contractors, equipment delivery, install

    How we help —We source from the marketplace and brands, coordinate vendors, run the checklist.
  5. 05

    Commissioning

    Setpoints, SOPs, staff

    How we help —We commission the rooms and train the team.
  6. 06

    First harvest

    Tuning and targets

    How we help —We tune the first three cycles against the basis of design.
Lead magnet —

The pre-concrete checklist.

Forty-one questions to answer before the lease, the engineer and the equipment quotes.

  • Utility capacity and letters
  • Canopy tier and room ratio
  • Dry and cure capacity
  • Equipment lead times
  • Lender questions
State license review —
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
FAQ —

New license questions

Do you help with the application itself?

We handle the facility side: program, design, equipment and the operating plan the application asks for. Licensing counsel handles the legal side.

Answered by Trevor Christensen
When should we start?

Before the lease. The program decides the building, not the other way round.

Answered by Trevor Christensen
How long from award to first harvest?

3 to 6 months for a ground-up build from program to commissioning.

Answered by Trevor Christensen
Which states?

Anywhere with a license. Hubs cover Virginia, Nebraska, Texas and Missouri. [TK]

Answered by Trevor Christensen